Kontakt
Kontakt
Kontakt
Kontakt
Kontakt
HM Informatik AG - Modernization of Applications
You are here: Welcome Page | Services | Modernization of Legacy Applications

Modernization of Applications

The HM Strategy of Modernization is implemented in stages so that the migration is split into easily assessable, small parts.

An overview of the HM Strategy of Modernization

  1. Analysing the legacy system
    By understanding the legacy system the basis for a succesful migration is established. Aside from incorporating the current system structure and analyzing the documentation, reverse engineerring is also a way to accomplish this.
     
  2. Deconstructing the legacy system
    To preserve existing interfaces between individual modules and the database back-end the legacy system is 'disassembled' and the necessary interfaces defined.
     
  3. Creating the migration concept
    Following the analysis of the legacy system a detailed migration concept is created. This concept will form the basis of the migration as agreed upon with the customer.
     
  4. Optional: Developing the GUI of the new system
    In accordance with the new parameters new GUIs are developed and tested for usability.
     
  5. Optional: Developing the new application
    After deciding wether the application functionality of the legacy system should be recreated or taken as a guideline development of the new application starts.
     
  6. Developing the database back-end
    To implement the best possible relational database the requirements of steps 1-5 are included in the development to create the best possible system.
     
  7. Installing the new environment
    Following the completion of all components every necessary functionality test is conducted in a testing environment to troubleshoot at an early stage.
     
  8. Developing and installing gateways
    When the system is running flawlessly gateways to transfer data from the legacy to the new system are developed.
     
  9. Migrating databases from the legacy system
    After testing the gateways in the new environment and additional tests with the migrated data the new database system is installed. Following this the migration of data from the legacy to the new system begins.
     
  10. Migrating legacy applications
    When the new system is running flawlessly all necessary modules of the legacy system are replaced. All modules are adjusted to and implemented in the new system.
     
  11. Activating the new and turning off the legacy system
    Finally the new system is activated and the legacy system backed up and turned off.

Further information about Modernization

You can reach us in Germany at +49 3677 46 94 3-0 and in Switzerland at +41 9 6462565.
You also can leave us a message: